For Cranes ‘r Us in Lagos (Nigeria), we carried out lifting work with their 450-ton Krupp KMK8450 at a new Lafarge cement factory in Nigeria. All the lifting work was calculated in close cooperation with the Chinese contractor and measured on site with autocad and GPS. The entire assignment was carried out safely and well within the specified time.